Completion Management

Handesly Commissioning

Systems-based completion, commissioning, readiness, and handover control.

Handesly CCMS General ITR Dashboard showing completion status, ITR controls, and system progress
CCMS interface shown with anonymized demonstration data.
01 / The work

From individual checks to a complete handover.

Completion depends on more than a progress total. Systems, check sheets, punch items, and certificates need a clear path through verification and closure.

Operational valueReduces rework, late handover effort, printing, scanning, and manual dossier collation.

02 / The workflow

From scope to handover.

  1. 01

    Scope

    Systems

    Structured scope

  2. 02

    Verify

    Check sheets

    Linked evidence

  3. 03

    Commission

    Punch items

    Owner and due date

  4. 04

    Handover

    Turnover packs

    Handover index

03 / Capabilities

The detail
behind the work.

  1. 01

    Organize projects by system, subsystem, discipline, tag, and handover package.

  2. 02

    Track pre-commissioning and commissioning activities, check sheets, certificates, and test records.

  3. 03

    Control punch items by priority, owner, due date, verification, and closure status.

  4. 04

    Monitor readiness and progress by system, discipline, area, contractor, and blocker.

  5. 05

    Assemble traceable turnover dossiers and handover evidence from one controlled workflow.

04 / Designed for

Built around
your team’s work.

EPC projects, industrial facilities, energy and oil & gas operators, commissioning teams, completion teams, and handover teams.